ABOUT
US
Delivering Safe Nuclear Decommissioning Solutions at the
Forefront of Innovation.
Cumbria Nuclear Solutions Limited is an alliance
of:
- James Fisher Nuclear Ltd
- REACT Engineering Ltd
- Shepley Engineers Ltd
- Stobbarts Ltd
- White Young Green Consulting
Ltd
These companies have a proven track record of excellence in
project front end engineering, design, integration and implementation of nuclear
decommissioning projects. They work together within an innovative delivery
mechanism to provide value for money, accelerated, safe and environmentally
friendly clean-up programmes in the nuclear sector.
With over 100 years of lead team collective experience across the
UK nuclear industry in Tier 1, 2 and 3 contractor organisations, CNSL offer an
understanding of the Nuclear Decommissioning Authority environment and first
hand experience of applying commercial and engineering best
practices.
As a West Cumbrian Team, CNSL is proud to support the local
nuclear industry. Its local
workforce provides continuity of knowledge and excellent response times to the
Client whilst benefiting the local economy.
|
Front
End Characterisation |
|
Civils
Isolations (setting up work area) |
Environmental
assessment / BPM |
|
M&E
Isolations (setting up work area) |
Radiological
safety assessment |
|
Safety
Documentation |
Criticality
safety assessment |
|
Characterisation
methodology |
INSA |
|
Sample
taking and analysis |
Optioneering |
|
Sample
interpretation/characterisation |
Decommissioning/waste
methodologies |
|
Problem
identification/definition |
Concept
design |
|
General
safety case support |
FEL
gate pack preparation |
|
Manufacturing
& Installation |
|
Trial
and Test rig design |
Building
services M&E detail design (inc vent) |
|
Trial
methodologies |
C&S
Engineering substantiation |
|
Test
rig manufacture / construction |
Mechanical
engineering substantiation |
|
Trial
operations |
CE&I
engineering substantiation |
|
Geo
- Environmental engineering |
General
manufacture |
|
C&S
Design Solution |
Specialist
manufacture |
|
Specialist
M&E design solution |
M&E
installation/works |
|
Building
services M&E design solution |
Civils
installation / works |
|
C&S
detail Design |
Testing
and commissioning strategy |
|
Specialist
M&E detail design |
Testing
/ commissioning |
|
Project
Management |
|
Scheduling |
Procurement
schedule |
|
Resource
planning |
Risk
analysis |
|
Lifetime
plan production |
Risk
programme |
|
Estimating
lead |
Delivery
of regulatory approvals |
|
Operations |
|
Civils
C1 to C5 general work |
Specialist
equipment maintenance |
|
M&E C1 to C5 general work |
Scaffolding |
|
Civils
manual size reduction |
Rigging |
|
Mechanical
manual size reduction |
Control
& supervision of operations |
|
Remote
size reduction operations |
Mechanical
nominated person responsibility |
|
Waste
handling |
Electrical
nominated person responsibility |
|
Waste
segregation and packing |
RPS
responsibility |
|
Health
Physics monitoring |
Specialist
/ hazardous material handling |
|
Safety
equipment working |
Decontamination
of plant & equipment |
|
Civils
Infrastructure maintenance |
Pre
demolition strip out |
|
M&E
infrastructure maintenance |
Civils
demolition |