Cumbria Nuclear Solutions Limited
HomeAbout UsProject ProfilesJob OpportunitiesGroup NewsContact Us

 
View our projects
  Click here

  View our vacancies
  Click here

Cumbria Nuclear Solutions Ltd
Fleswick Court, Westlakes Science and Technology Park, Whitehaven, Cumbria CA24 3HZ

Telephone: 01946 590511
Fax: 01946 591044
Email: info@cumbrianuclearsolutions.co.uk


Contact Form

ABOUT US

Delivering Safe Nuclear Decommissioning Solutions at the Forefront of Innovation.

 

Cumbria Nuclear Solutions Limited is an alliance of:

  • James Fisher Nuclear Ltd
  • REACT Engineering Ltd
  • Shepley Engineers Ltd
  • Stobbarts Ltd
  • White Young Green Consulting Ltd

These companies have a proven track record of excellence in project front end engineering, design, integration and implementation of nuclear decommissioning projects.  They work together within an innovative delivery mechanism to provide value for money, accelerated, safe and environmentally friendly clean-up programmes in the nuclear sector.

 

With over 100 years of lead team collective experience across the UK nuclear industry in Tier 1, 2 and 3 contractor organisations, CNSL offer an understanding of the Nuclear Decommissioning Authority environment and first hand experience of applying commercial and engineering best practices.

 

As a West Cumbrian Team, CNSL is proud to support the local nuclear industry.  Its local workforce provides continuity of knowledge and excellent response times to the Client whilst benefiting the local economy.

 

 

Front End Characterisation

Civils Isolations (setting up work area)

Environmental assessment / BPM

M&E Isolations (setting up work area)

Radiological safety assessment

Safety Documentation

Criticality safety assessment

Characterisation methodology

INSA

Sample taking and analysis

Optioneering

Sample interpretation/characterisation

Decommissioning/waste methodologies

Problem identification/definition

Concept design

General safety case support

FEL gate pack preparation

Manufacturing & Installation

Trial and Test rig design

Building services M&E detail design (inc vent)

Trial methodologies

C&S Engineering substantiation

Test rig manufacture / construction

Mechanical engineering substantiation

Trial operations

CE&I engineering substantiation

Geo - Environmental engineering

General manufacture

C&S Design Solution

Specialist manufacture

Specialist M&E design solution

M&E installation/works

Building services M&E design solution

Civils installation / works

C&S detail Design

Testing and commissioning strategy

Specialist M&E detail design

Testing / commissioning

Project Management

Scheduling

Procurement schedule

Resource planning

Risk analysis

Lifetime plan production

Risk programme

Estimating lead

Delivery of regulatory approvals

Operations

Civils C1 to C5 general work

Specialist equipment maintenance

M&E C1 to C5 general work

Scaffolding

Civils manual size reduction

Rigging

Mechanical manual size reduction

Control & supervision of operations

Remote size reduction operations

Mechanical nominated person responsibility

Waste handling

Electrical nominated person responsibility

Waste segregation and packing

RPS responsibility

Health Physics monitoring

Specialist / hazardous material handling

Safety equipment working

Decontamination of plant & equipment

Civils Infrastructure maintenance

Pre demolition strip out

M&E infrastructure maintenance

Civils demolition

 



 
 

  Home        About Us        Project Profiles        Job Opportunities        Group News        Contact Us

Copyright © 2007 - Cumbria Nuclear Solutions Ltd

Cumbria Nuclear Solutions Ltd
Registered in England No. 2966923
Registered Office: Westlakes Science & Technology Park,
Fleswick Court, Moor Row, WHITEHAVEN, Cumbria, CA24 3HZ

Disclaimer ¦ Privacy Statement






Powered by